For expert advice & assistance call: 03-9796-4002
Day

July 20, 2016

Telstra – New Energy Centre, Clayton, VIC

Systems Insight has completed two major projects on this high profile site with critical power requirements: One project was to provide generator control systems to operate four emergency diesel generators; whilst the other project was to install a SCADA System for operators to supervise the four generators and the LV & HV power reticulation systems. […]

St Vincent’s Hospital, Melbourne, VIC

Design and manufacture of an emergency power distribution management system for the hospital. A custom-designed Master Control Panel was supplied to operate emergency power generators and provide comprehensive building load management on emergency generator supply.

RAAF Base Townsville, QLD

Design and manufacture of a comprehensive emergency power management system for the air force base. The system features a custom-designed Master Control panel and three generator paralleling control panels, each fitted with Woodward EGCP-3 LS synchronizing controllers and HMI touch panels.

NAB Data Centre, Melbourne, VIC

A Master Control panel was designed and manufactured to manage operation of a Cummins gas engine generator set for a tri-generation system at the NAB Knox data centre. The control system featured complex PLC program engineering to operate the co-generator according to building load demand and required extensive use of high level communications. The tri-gen […]

Melbourne Airport, Tullamarine, VIC

Systems Insight has provided a number of emergency power management control systems at Melbourne Airport were expanded by installation of new PLC control panels in various LV substations around the airport terminal. The new satellite PLC’s were integrated to a network of PLC’s that form a comprehensive emergency power load management scheme.

Launceston Hospital, Launceston, TAS

Design and manufacture of a co-generation management system for the hospital. A custom-designed Master Control Panel was supplied to operate the system for both co-generation and emergency power, by interface to a 2 Megawatt CAT gas engine generator set. Systems Insight also supplied motor control centres and protection control panels for the project.

HP Data Centre, East Burwood, VIC

Design and manufacture of a new emergency power Master Control system featuring custom-design for dual, redundant PLC controls. The new Schneider TSX-Premium PLC system was installed as an upgrade to a discontinued PLC platform. The installation required us to maintain the full availability of the emergency power plant throughout the changeover process.

Channel 9, Melbourne, VIC

Design and manufacture of a Master Control system, for management of emergency generator power supply to new television studios and offices for GTV Channel 9, Docklands, Melbourne. The system features a Hot Standby PLC system with dual redundant CPU’s and distributed PLC I/O. A HMI touch screen operator panel is also provided, with dynamic screen […]

Ballarat Health Services, Ballarat, VIC

Systems Insight has contributed significantly to the upgrade of Ballarat Hospital’s Emergency Power Generators, by upgrading existing control panels and installing new generator control panels to facilitate automatic starting and stopping of the generators in response to unexpected power outages, or maintenance on the electrical distribution system. A total of 24 new control panels were […]